Announcements, releases and milestones from across the platform.

The US added 6.7 GW of instantaneous power in Q2 2026, roughly a tenth of the entire national storage fleet in three months, with seven individual projects each above 1 GWh.

Anglian Water extended its Samotics framework for two more years. The technique reads cavitation, bearing wear and misalignment from the motor's electrical signature, with no sensor on the asset.

Sygnia reports a China-linked group turning Cisco IOS XR routers and TACACS servers into a collection platform — compromising the layer that authenticates and audits administrators.

A revised information collection cuts the estimated respondent count by 92% and the annual burden from 210,684 hours to 22,167 — a large change in who actually carries surface transport cyber obligations.

Kontron Transportation won several contracts on the Romanian section of the Orient/East-Med Corridor, working under Hitachi Rail Romania, with a 48-month delivery period.

Mimosa Mine in Zimbabwe spent three years migrating legacy OT networks, adding segmentation and controlled access — a migration shaped by conditions that make mining the hardest place to do it.

The VISION Award shortlist includes a sensor measuring velocity at every pixel from Doppler rather than frame differences, and software that simulates an inspection system before anyone buys the hardware.

EinScan Trak moves the retroreflective targets from the part onto the scanner body, so large components can be scanned without the hours of sticker application that normally precede the measurement.

TwinDEX pairs a wearable data-collection glove with an identical robotic gripper, and reports 5.3 times the throughput of on-robot teleoperation with no on-robot training data at all.

TI's BQ79826Z-Q1 integrates an impedance spectroscopy engine on the monitor die and reads 26 cells, letting a BMS separate state of charge from permanent chemical degradation.

Hydrostor's 200 MW / 1,600 MWh Silver City project at Broken Hill has AEMO and Transgrid approval, with 50 MW / 250 MWh reserved as backup power for the town itself.

Modelling puts the threshold at 5.4% of ERCOT's storage fleet, and the detection problem is severe: a battery flipping from charge to discharge in under a second is normal behaviour.
Tell us what you're building and we'll help you scope the first deployment.